Thursday, September 1, 2011
moving along
They are moving along with the house and we are hoping to be moved back in 5 weeks or so from now. The heat, electrical and roof inspections said we were good to go. They have measured for the countertops. As I am typing, the crew is putting up new drywall (the hallway, two of the bathrooms upstairs as well as numerous walls/misc parts of the ceilings up and down stairs are getting fixed). The next step will be turn on the air once insulation is in and get the house cooled so the hardwoods can be put in upstairs and refinished downstairs. Rusty gets to pick basement carpet (yep, his one room in the house). We also are waiting for the two new bay windows for the back of the house. We also had to add a new fence in the front of the house. We had some trees removed and the old fence was going to need a lot of work to put back up.....add it to the list. I will post pictures this week.